বিদ্যুৎ সঞ্চালন

The main operating function of PGCB is wheeling of energy from BPDB power stations and Generation Companies to Distribution entities utilizing transmission network. PGCB gets its energy wheeling charge from its clients(distribution entities) at the rate fixed by Bangladesh Electricity Regulatory Commission (BERC).
The PGCB took over about 1144 circuit km of 230 kV lines, 5255 circuit km of 132 kV lines, 6 nos of 230/132 kV substation and 63 nos of 132/33 kV substations from BPDB and DESA in different phases. Transmission lines of the company up to September, 2023 are stood at 2162 ckt km of 400 kV lines, 4236 circuit km of 230 kV lines, 8,303 circuit km of 132 kV lines and 1 nos of 400 kV Station, 6 nos of 400/230kV subtation, 4 nos of 400/132kV subtation, 28 nos of 230/132 kV substation, 1 nos of 230/33 KV substation and 126 nos of 132/33 kV substations.
The company has taken infrastructure development projects for further development of its operation.

 

Transmission Infrastructure Information
Tansmission Line as on: September, 2023
400kV 2,162 Circuit km
230kV 4,236 Circuit km
132kV 8,303 Circuit km
206 Circuit km (Others)
Substation as on: September, 2023
400kV 1 Nos. 2x500MW HVDC Back to Back station
400/230kV 6 Nos. 8,755 MVA
2 Nos. 1,690 MVA (Others)
400/132 kV 4 Nos. 2,795 MVA
230/132kV 28 Nos. 15,825 MVA
2 Nos. 550 MVA (Others)
230/33KV 1 Nos. 420 MVA
4 Nos. 970 MVA (Others)
132/33kV 126 Nos. 26,003 MVA
42 Nos. 6,992 MVA (Others)
Dispatch Capacity at 33kV level 30,946 MW (Including all organizations)
Last Five years achievement
400/230kV  4 Nos. 6,675 MVA
400/132 kV 3 Nos. 2,145 MVA
230/132kV Substation 8 Nos: 4,500 VA
230/33KV Substation 1 Nos: 420 VA
132/33kV Substation 26 Nos. 4,732 MVA
400kV Transmission Line 1,492 Circuit km
230kV Transmission Line 877 Circuit km
132kV Transmission Line 1,363 Circuit km